Coming soon

Bore completion reports simplified, drilling programs managed.

Intelligent drilling program management and bore completion software. Built for hydrogeologists by hydrogeologists.

Bore A01, from the lithology sheet to a signed completion.

Construction

SWL 14.8 m

SWL

Screen

A01_lithology.xlsx

Sheet1

FromToLithology
0.0032.00Sand
32.0086.00Clay
86.00148.00Silt
148.00268.00Ss

Site map

Google Maps

A01 · Amberwell, WA

Checks

2 passed · 1 held

  • Interval continuityPassed
  • Australian lithology enumPassed
  • Screen vs lithologyHeld

Built for the field

01

Completion diagrams

AI extracted, human finessed, clearly presented. Casing, screen, and SWL drawn from the model, not redrawn in CAD.

Watercolor bore completion diagram
AI extracted

0

540

FromToElement
0.0018.00Surface
18.00320.00Intermediate
532.00538.00Screen

SWL 14.8 m

Screen 532-538

02

Intuitive data entry processes

Lithology, stratigraphy, water quality and geophysics data input tables designed for rapid field entry. A system that keeps up with the rig.

Field documents becoming structured records

Sheet1 · 142 intervals · 0.00 to 540.00 m

#FromToLithology
10.0032.00Sand
232.0086.00Clay
386.00148.00Silt
4148.00268.00Sandstone

Frozen headers from A01

Imported

03

QA/QC systems in place

A step built for data scrutiny and oversight. Information is checked by the machine, reviewed and signed off by a senior and then distributed.

Reviewing a geological log

2 passed · 1 to resolve

  • ✓
  • ✓
  • !

Sign-off

04

Optimised folder structure and data accessibility

Intuitive project and bore data accessibility, designed for easy access.

Hydrogeologists reviewing a completion drawing

Organisation / Project

  • A01Complete540 m
  • A02Drilling212 m
  • A03Planned-
Field crew logging a drill program

05

Drill program management

Contacts, staff movements, daily logs and drilling progress, all in one dashboard.

Daily log · 18 Apr · 3 of 6 bores

  • T. WalshDrillerRig 4 · on site
  • M. BlakeHydrogeologistA01 sign-off
  • J. HaleField techMoving to A02
Layered ground ready to share as a bore overview

06

Bore overview reports

Key information, ready to be shared.

Ready to share

Depth

540 m

SWL

14.8 m

Screen

532-538

Status

Signed

Aerial view of a drilling program

07

Drilling program metrics

KPIs, drill depths, downtime, tracked and shareable.

Amberwell · this week

  • Metres drilled1,262 m
  • Downtime4.5 h
  • Utilisation86%

Structured data
first

Built around Australian bore completion practice. The product wins when an Excel file becomes a publication-grade log, not when a drawing is traced by hand.

Organisation → Project → Bore

The same tree the work already uses. Amberwell, then A01.

Structured intervals

Lithology and construction are rows with from, to, and type. Drawings come after.

Named sign-off

Every edit is tied to a hydrogeologist. The BCR does not leave unsigned.

Field Excel, then the app

Templates work offline on a tablet today. App sync is next, not a claim we make now.

Pilot licences

Save a seat

Tell us who you are and we will write back when a licence opens for Australian consultancies.